Restoration Timeline

1984
The Corporation for Jefferson’s Poplar Forest purchased the main house and 49.5 acres

 

1985
Record drawings and photographs by the Historic American Buildings Survey

 

1986
S. Allen Chambers begins documentary research

 

Property opens to public on limited basis

 

1988
Emergency stabilization plan drafted

 

First archaeology staff hired

 

Architectural Advisory Panel established

 

1989
Stabilization work completed

 

Director of Architectural Restoration hired

 

Phase One of historical research completed

 

1990
Consulting restoration architect hired

 

Architectural conservator hired

 

Surface mapping of main house and photographic documentation (staff)

 

Investigation of sub-surface layers begins (staff)

 

Detailed architectural research drawings based on investigation and meetings of the Architectural Advisory Panel (6-month phases)

 

One-inch scale investigation drawings (staff) and one-inch professional photographs with annotated overlays

 

Architectural Restoration Field School starts

 

1991
Second phase of documentary research completed

 

1992
Main House Investigation Report (HSR) completed by architects

 

One-inch scale drawings of interior and exterior walls by architects

 

Investigation of privies and East Wing

 

Historic Structures Report by staff

 

Advisors, consultants, staff and board establish restoration plan and guidelines

 

Preparation for bricks and mortar phase

 

1993
Underpinning and waterproofing of outer walls; drains for foundation and roof

 

Restoration mason starts stabilization of walls and south portico columns

 

Restoration workshop and conservation lab established

 

Mortar reproduction process

 

Restoration craftsman assistant hired

 

1994
Completion of footings and drain system

 

Mortar analysis to make lime mortar

 

Working drawings for roof reconstruction

 

1995
Conservation repair and repointing of exterior walls with lime mortar

 

Millwork for exterior trim

 

Reproduction bricks made

 

Architectural Conservator Consultant hired

 

Getty grant for conservation work

 

Restoration of exterior walls complete

 

Cube Room brick walls restored to 20’

 

Main House terras roof and skylight framing

 

1996
Principal timber frame roof completed

 

1997
Main House terras deck and skylight completed

 

Tuscan Entablature completed

 

Roof balustrade completed

 

Stair pavilions and portico roof and pediment framing

 

Masonry conservation of east and west octagonal privies

 

1998
Tinned shingles on main roof completed

 

Terras roof Chinese railing installed

 

Sash windows, louvered blinds and exterior doors installed

 

North portico stairs completed

 

North and South columns rendered with lime stucco

 

Conservation and restoration of interior walls completed

 

Exterior restoration of main house completed

 

1999
Conservation and restoration of 14 fireplaces and hearths

 

Interior floor system of oak joists and oak floorboards restored (radiant heat underneath)

 

Mechanical system for heating and cooling begun

 

2000
Counter-sealing of lower level ceilings installed

 

Staircase reconstructed in East Pavilion

 

North passage walls reconstructed

 

Lower level brick floors restored (radiant heat and air tubes underneath)

 

Mechanical system completed with mechanical room and remote vault

 

Conservation/restoration/reconstruction of East Wing began

 

2001
Staircase in West pavilion reconstructed

 

Restoration of East and West privies: windows, door, seat, stairs

 

Limestone burned in traditional kiln for lime putty mortar

 

2002
Masonry walls completed for East Wing

 

Plaster grounds and split lath installed for ceiling plaster

 

Three-coat lime plaster installed in four rooms. East and northeast room ceilings left unplastered

 

Chestnut shingles restored to East and West Privy roofs

 

Reproduction spring locks installed on sash windows

 

Masonry of East Wing complete; kitchen with hearth, oven, set kettle, stew stove

 

Old and new poplar plates installed on wing walls

 

West alcove bed framing

 

Sash doors of parlor installed

 

2003
Ceiling plaster of cube room completed

 

Plaster grounds installed for wall plaster

 

Three-coat lime plaster on walls completed

 

Passage walls filled with brick and lath installed

 

Ridge and gutter joists for East Wing roof started

 

2004
Joists and blocking for wing roof completed

 

2005
East alcove bed framing completed; walls nogged with brick; alcove plastered

 

2006
Fabrication and installation of East Wing terras roof shingles

 

2007
East Wing entablature

 

East Wing roof caps on shingles

 

East Wing waterproof membrane on shingles

 

2008
Window frames, sash and trim made and installed in Wing

 

Doors made and installed in Wing with reproduction hardware

 

Oak deck panels on Ipe sleepers made

 

2009
Custom stainless steel deck railing made and installed on Wing

 

Stairs constructed for Wing

 

Exterior architectural restoration of Jefferson's architecture finished, with the completion of the east wing